Case Studies

Please see below a list of projects completed by PJD, further information on these projects please contact the Marketing Department on marketing@pjdltd.com.

 Reference list1.bmp

Aberthaw Power Station

Mill Classifier Installation

Management of the full installation of new classifiers prior to the main outage ensuring disruption was kept to a minimum by working closely with both the client and the overhaul contractor.

Reference list2.bmp

Aberthaw Power Station

Refurbishment of Coal Reclaimer

Re-commissioning of the coal ground hopper reclaim system at the station, including the new re-claim hopper grid and associated moving parts.

Reference list3.bmp

Barking Reach Power Station

Combined Cycle Control Valve Replacement

Replacement of the control valves and modifications to the existing pipework to bring the control valve flow parameters in line with manufacturer’s requirements.

Reference list3.bmp

Barking Reach Power Station

Combined Cycle Drain Pot Refurbishment

Supply and installation of the steam system drain pots together with modifications to level controllers and pipework differs. 

Reference list5.bmp

Cameronbridge Distillery

Installation of Boiler and Associated Works

Full installation and testing of the combustion grate, water tube fluidised bed gas and biomass boiler, piping and attachments, balance of boiler house mechanical plant systems, combustion air fans and ducting, flue gas ducting and refractory works.

Reference list6.bmp

Cauldon Works

Cement Works Outage Maintenance

Management of all outage work projects, on-site inspections, project management and commissioning through an innovative “one-package” solution.

Reference list7.bmp

Damhead Creek Valve 

Harp Header Repairs and Replacement of Steam Valves

Contracted with providing an innovative Lifting Solution for restricted Access, PJD carried out Harp Header Inspection and Repairs and the Removal & Replacement of Steam Valves.

Reference list8.bmp

Ferrybridge Power Station

SO3 System Installation

Design, supply & installation of a state-of-the-art SO3 system, including the supply and installation of the storage tank, design of the pipe routing and installation and commissioning of the S03 system.

FiddlersFerrySCR.jpg

Fiddlers Ferry Power Station

Boiler Outage & Term Maintenance

Principal contractor on site since 2001 delivering the boiler outage and term maintenance contract, while also completing a number of projects including Partial CMV replacement, Sling Rod and Top Dead space floor casing replacement and the HP & IP loop pipe renewal.

Reference list9.bmp

Hope Cement Works

Fredenhagen Conveyor Replacement

Replacement and commissioning of two unique ash conveyors at the Hope Works Cement Plant during normal plant operations.

Reference list10.bmp

Lakeside EfW

Installation of Boiler and Associated Balance of Plant

Complete installation and testing of the combustion grate, water tube boilers, piping and attachments, ash-handling systems, balance of mechanical plant systems and metallic industrial field piping.

Reference list11.bmp

Longannet Power Station

Removal and Replacement of Bunker Linings

In line with a major programme of updates and improvements, PJD were contracted to remove, reline and replace the existing bunker.

 rugeley-fgd.jpg

Rugeley Ferry Power Station

Boiler Outage and Term Maintenance

Longstanding boiler outage and term maintenance contractor delivering a number of projects since 2003 including coal milling plant maintenance, boiler plant maintenance, pressure part repairs, air heater & draught plant maintenance 

Reference list12.bmp

Shoreham Power Station

Repair and Maintenance Framework

Delivery of all repair and maintenance through a framework agreement, while also completing a major mid-life outage to realign and repair the HRSG internal trusses.

Reference list13.bmp

Shotton CHP Plant - Steam Valves

Steam Valve Repair

Reactive emergency repair works, providing emergency 24 hour project mobilisation for the external replacement of two valves on P91 material.